Just The 2 Of Us
Welcome to our journal. We would like to share with our family and friends the journey we are embarking on, building our home.
Wednesday, November 10, 2010
Monday, November 8, 2010
Tuesday, November 2, 2010
Friday, October 29, 2010
Sunday, October 3, 2010
Slab
2 October 2010 - After plenty of rain throughout September leaving us with a very soggy block we finally have our slab. I must say the wait was rather excruciating.

Friday, August 27, 2010
Electricity and Water
24 August 2010 - The developers of the estate have planted a tree in our nature stripe today. It's a little Gum Tree.

25 August 2010 - We have been pegged out and by the looks of things the builder has kindly built us a swimming pool where are garage was going to be.

26 August 2010 - We have pipes along with a big mushy mess!

27 August 2010 - We have electricity and even more mush! The pole with the red top and wires sticking out is the electricity. There will be a meter box attached to this soon.
Who's idea was this to build during our wettest winter in a decade!
25 August 2010 - We have been pegged out and by the looks of things the builder has kindly built us a swimming pool where are garage was going to be.
26 August 2010 - We have pipes along with a big mushy mess!
27 August 2010 - We have electricity and even more mush! The pole with the red top and wires sticking out is the electricity. There will be a meter box attached to this soon.
Monday, August 23, 2010
Site Cut
Our site cut was done today. We also have a port-a-loo, temporary fencing and a rubbish cage.
The digger working away on our block.

Our port-a-loo, rubbish cage and temporary fencing.

The site cut from the front.

The site cut from the back.
The digger working away on our block.

Our port-a-loo, rubbish cage and temporary fencing.
The site cut from the front.
The site cut from the back.
Subscribe to:
Posts (Atom)